The main concept behind the design of Carr Manor is to provide a building which makes a strong statement to the students, staff and community alike and provides a landmark building expressing a clear architectural vision.
The creation of a variety of spaces both internally and externally...
Shepherd Construction Ltd took possession of the site in November 2004. The existing structure was five storeys high with a basement and was constructed using a steel frame encased with concrete panels.
The contract consists of a 20-week demolition period, including 8 weeks of asbes...
careyjones, in conjunction with their Clients Berkeley / Crosby, were awarded the commission to master plan Clarence Dock after being selected the outright competition winner. The bid was thoroughly researched and analysed in order to create a genuine mixed use development. The site signifies the...